# | Project Title | Client Name | Job Scope | Complete on Date |
---|---|---|---|---|
1 | PROJEK MASS RAPID TRANSIT LEMBAH KLANG - JAJARAN SUNGAI BULOH - SERDANG - PUTRAJAYA THE RELOCATION AND REINSTATEMENT OF EXISTING POWER CABLES FOR ADDITION AND ALTERATION WORKS (A&A) AT TITIWANGSA STATION (ST2). | 2021 |
||
2 | PROJECT MASS RAPID TRANSIT LEMBAH KELANG - JAJARAN SUNGAI BULOH - SERDANG- PUTRAJAYA. THE RELOCATION OF EXISTING TELECOMMUNICATION CABLE FOR ADDITION AND ALTERATION WORKS (A&A) AT TITIWANGSA STATION (ST2). | 2021 |
||
3 | PROPOSED DOUBLE CIRCUIT 132KV UNDERGROUND CABLE FARLIM (FILM) TO PMU SUNGAI ARA (SARA), PULAU PINANG. | 2021 |
||
4 | KONTRAK KERJA-KERJA HDD 11KV UNTUK UNIT PEMBANGUNAN ASET ZON JOHOR. | 2020 |
||
5 | KERJA-KERJA PERENTANGAN DAN PENYAMBUNGAN KABEL 33KV UNTUK UNIT PEMBANGUNAN ASET NEGERI JOHOR DISTRIBUTION NETWORK DIVISION. | 2019 |
||
6 | KERJA-KERJA PERENTANGAN DAN PENYAMBUNGAN KABEL 33KV UNTUK UNIT PENYAMBUNGAN ASET ZON NEGERI PERLIS BAHAGIAN PEMBAHAGIAN TNB. | 2019 |
||
7 | PROPOSED 132KV DOUBLE CIRCUIT UNDERGROUND CABLE FROM PMU SUNCITY TO PMU MRT COCHRANE. | 2019 |
||
8 | KERJA-KERJA PERENTANGAN DAN PENYAMBUNGAN KABEL 33KV UNTUK UNIT PEMBANGUNAN ASET ZON KUALA LUMPUR BAHAGIAN PEMBAHAGIAN, TNB. | 2019 |
||
9 | KERJA SESALUR ATAS VOLTAN TINGGI (SAVT) 33KV UNTUK UNIT PEMBANGUNAN ASET NEGERI PAHANG, BAHAGIAN PEMBANGUNAN TNB. | 2019 |
||
10 | KERJA-KERJA PEMASANGAN, PENGUJIAN DAN MEMULATUGAS UNTUK PROJEK BEKALAN ELEKTRIK LUAR BANDAR (BELB) SAMBUNGAN TALIAN GRID SEMENANJUNG MALAYSIAN TAHUN 2020-NEGERI KELANTAN (PAKEJ) 1 – KG. BUKIT TANDAK, RANTAU PANJANG DAN KG SRI BINTANG,MUKIM PENDOK,JELI DAN KG JENAL,DABONG. | 2022 |
||
11 | KERJA-KERJA PEMASANGAN, PENGUJIAN DAN MEMULATUGAS UNTUK PROJEK BEKALAN ELEKTRIK LUAR BANDAR (BELB) SAMBUNGAN TALIAN GRID SEMENANJUNG MALAYSIAN TAHUN 2020-NEGERI KEDAH, BALING. | 2022 |
||
12 | KERJA-KERJA PEMASANGAN, PENGUJIAN DAN MEMULATUGAS UNTUK PROJEK BEKALAN ELEKTRIK SK JUASSEH, KUALA PILAH, NEGERI SEMBILAN. | 2022 |
||
13 | CADANGAN PEMBINAAN STESEN MINYAK DI PEDAS, REMBAU NEGERI SEMBILAN. | 2022 |
||
14 | KERJA-KERJA PEMBINAAN BANGUNAN PENCAWANG PEMBAHAGIAN UTAMA, PUCHONG, SELANGOR. | 2021 |
||
15 | KERJA-KERJA MEMBEKAL DAN PEMASANGAN COMPACT SUBSTATION UNIT (CSU) PRECAST PLINTH BAGI PROJEK BEKALAN ELEKTRIK LUAR BANDAR (BELB) SAMBUNGAN TALIAN GRID SEMENANJUNG MALAYSIAN TAHUN 2020-KAMPUNG BARU SG RIAU, CHIKU 6 GUA MUSANG KELANTAN. | 2022 |
||
16 | KERJA-KERJA PEMASANGAN DAN PEMBINAAN UNTUK PROJEK PERUMAHAN DI LOT 107 (PT 81 – PT 87) JALAN MELANG 72000 KUALA PILAH NEGERI SEMBILAN. | 2022 |
||
17 | KERJA-KERJA MEMBEKAL UNTUK PEMBINAAN STESEN MINYAK DI KRUBONG, MELAKA DAN SEREMBAN JAYA. | 2022 |
||
18 | KERJA-KERJA PEMASANGAN UNTUK PROJEK PERUMAHAN BANGLO 2 TINGKAT DI MUKIM DURIAN TUNGGAL, DAERAH ALOR GAJAH, HANG TUAH MELAKA. | 2022 |
||
19 | CADANGAN MEMBINA SEBUAH BANGUNAN PEJABAT DI ATAS HAK MILIK GM 25 LOT 13253, MUKIM PERINGGIT MELAKA TENGAH, HANG TUAH JAYA MELAKA. | 2022 |
||
20 | KERJA-KERJA PEMASANGAN UNTUK PROJEK PERUMAHAN BANGLO 2 TINGKAT DI MUKIM DURIAN TUNGGAL, DAERAH ALOR GAJAH, HANG TUAH MELAKA. | 2022 |
||
21 | KERJA-KERJA MEMBEKAL DAN PEMASANGAN PRECAST TNB COMPACT SUBSTATIOPN UNIT DI TAMAN LIMBONGAN INDAH, MELAKA. | 2022 |
||
22 | KERJA-KERJA MEMBEKAL DAN PEMASANGAN PRECAST TNB COMPACT SUBSTATION UNIT DI HICOM, PEGOH ALOR GAJAH MELAKA. | 2022 |
||
23 | KERJA-KERJA MEMBEKAL DAN PEMASANGAN PRECAST TNB COMPACT SUBSTATION UNIT DI BUKIT RAMBAI. | 2022 |
||
24 | KERJA-KERJA MEMBEKAL BAGI PROJEK PMU AMPANG TO PMU TAMAN MELAWATI. | 2022 |
||
25 | PROPOSED DOUBLE CIRCUIT 132KV UNDERGROUND CABLE FARKLIM (FILM) TO PMU SG ARA (SARA) PULAU PINANG. | 2022 |